• Achieving a goal is philosophy.
  • Acquiring skills is the aim.
  • The workmanship is the practice.
  • Timely completion of the projects with above qualities
  • An expert in completing the projects before the schedule
  • The project execution for the decades has gone the days.
  • Megaprojects also complete before the schedule, if MEIL takes up.
  • The project results reach to people in advance.
  • Executing the projects at snail pace and doubling the cost are the gone the days.
  • Aim to reduce the burden on public exchequer and benefit the people
  • Hundreds of projects executed in time
  • There are many examples.
  • Those are the jewels in the MEIL crown.
  • Projects executed on the fast track in irrigation, drinking water, power, energy and transportation sectors.
  • Kaleshwaram, Handri-Neeva, Pattiseema, Water grid, Sauni Yojana, Ananthapur Solar, Sakri Solar, Khargon lift irrigation scheme, Kutch Water grid, Narmada-Kshipra, Dar-E-Salaam in Tanzania, Bhaktaramdas, Ramthal drip irrigation, NP Kunta substation, Kamareddy drinking water... Many more projects. The list is long.
  • Gajwel water grid inaugurated by Prime Minister
  • Completed 1200 km main pipeline for Gajwel water grid in just eight months
  • Gajwel, Kamareddy, Godavari schemes are landmarks project in Telangana
  • The first river interlinking project in the country Narmada-Kshipa-Simhastha

PATTISEEMA

  • Entered Limca Book of Records for completing the Pattiseema project in a record time
  • Godavari-Krishna rivers linked with Pattiseema project

KALESHWARAM

  • Diverted the Godavari river with Kaleshwaram project
  • Established the largest power infrastructure in Kaleshwaram

HNSS

  • The first major lift irrigation project in the country
  • Built 43 pump houses and established 269 pumping units
  • So far, nowhere in the world these number of pump houses

DRIP IRRIGATION WITH TECHNOLOGY

  • Ramthal is the largest drip irrigation project in Asia
  • Built 2150 kilometres pipeline for this project
  • The Isreal technology used in this project for the first in the country

THE LARGEST POWER SYSTEM: WPPTCL

  • WPPTCL is the largest power transmission system in Uttar Pradesh
  • For the first in the country, establishes 765 KW transmission system
  • Built with Gas Insulated Substation (GIS) technology for the first time

ANANTHAPUR SOLAR

  • 50MW solar power generation in Ananthapur district, Andhra Pradesh
  • Ananthapur solar project wins the Eneria Award
  • Award for the use of innovative technology

SAKRI PROJECT

  • 50MW Sakri Solar (Maharashtra) Project completed in just five months
  • Established with Photovoltaic technology

VADODARA CANAL TOP SOLAR

  • Constructed Vadodara canal top solar top project with modern technology methods
  • Inaugurated by UN Secretary-General Ban Ki-Moon
  • Vadodara solar project ranks among the top 100 innovative project list

NP KUNTA SUBSTATION

  • Power Grid Corporation's NP Kunta substation completed in a record time
  • Entered into Limca Book of Records as it executed in the shortest possible time in the country

RAAGESHWARI GAS TERMINAL

  • Raageshwari Gas Terminal built in a record time
  • Completed this project in just six months
  • The project has begun in September 2018 and completed by March 2019

HKR ROAD

  • Constructed 4-lane Hyderabad-Karimnagar-Ramagundam road in a record time
  • The length of this road is 206 Kilometres.

GAJWEL WATER GRID

  • Gajwel Water Grid inaugurated by Prime Minister.
  • Completed 1200 kilometre main pipeline in just eight months
  • Kamareddy, Gajwel and Godavari projects are landmark projects in Telangana.

SAUNI YOJANA

  • Prime Minister Sri Narendra Modi inaugurated Sauni Yojana project in Gujarat
  • Executed this project before the stipulated time
  • Water pumping to an altitude of 20 meters

DAR-E-SALAM

  • Dar-E-Salam is a drinking water project in Tanzania, the African continent
  • Supplied 70 million litres of drinking water to 18 lakh people
  • Laid 1600 kilometres pipeline
  • Constructed 24 tanks