Projects with Lightening speed - Result Oriented Works | Best Projects In India
- Achieving a goal is philosophy.
- Acquiring skills is the aim.
- The workmanship is the practice.
- Timely completion of the projects with above qualities
- An expert in completing the projects before the schedule
- The project execution for the decades has gone the days.
- Megaprojects also complete before the schedule, if MEIL takes up.
- The project results reach to people in advance.
- Executing the projects at snail pace and doubling the cost are the gone the days.
- Aim to reduce the burden on public exchequer and benefit the people
- Hundreds of projects executed in time
- There are many examples.
- Those are the jewels in the MEIL crown.
- Projects executed on the fast track in irrigation, drinking water, power, energy and transportation sectors.
- Kaleshwaram, Handri-Neeva, Pattiseema, Water grid, Sauni Yojana, Ananthapur Solar, Sakri Solar, Khargon lift irrigation scheme, Kutch Water grid, Narmada-Kshipra, Dar-E-Salaam in Tanzania, Bhaktaramdas, Ramthal drip irrigation, NP Kunta substation, Kamareddy drinking water... Many more projects. The list is long.
- Gajwel water grid inaugurated by Prime Minister
- Completed 1200 km main pipeline for Gajwel water grid in just eight months
- Gajwel, Kamareddy, Godavari schemes are landmarks project in Telangana
- The first river interlinking project in the country Narmada-Kshipa-Simhastha
PATTISEEMA
- Entered Limca Book of Records for completing the Pattiseema project in a record time
- Godavari-Krishna rivers linked with Pattiseema project
KALESHWARAM
- Diverted the Godavari river with Kaleshwaram project
- Established the largest power infrastructure in Kaleshwaram
HNSS
- The first major lift irrigation project in the country
- Built 43 pump houses and established 269 pumping units
- So far, nowhere in the world these number of pump houses
DRIP IRRIGATION WITH TECHNOLOGY
- Ramthal is the largest drip irrigation project in Asia
- Built 2150 kilometres pipeline for this project
- The Isreal technology used in this project for the first in the country
THE LARGEST POWER SYSTEM: WPPTCL
- WPPTCL is the largest power transmission system in Uttar Pradesh
- For the first in the country, establishes 765 KW transmission system
- Built with Gas Insulated Substation (GIS) technology for the first time
ANANTHAPUR SOLAR
- 50MW solar power generation in Ananthapur district, Andhra Pradesh
- Ananthapur solar project wins the Eneria Award
- Award for the use of innovative technology
SAKRI PROJECT
- 50MW Sakri Solar (Maharashtra) Project completed in just five months
- Established with Photovoltaic technology
VADODARA CANAL TOP SOLAR
- Constructed Vadodara canal top solar top project with modern technology methods
- Inaugurated by UN Secretary-General Ban Ki-Moon
- Vadodara solar project ranks among the top 100 innovative project list
NP KUNTA SUBSTATION
- Power Grid Corporation's NP Kunta substation completed in a record time
- Entered into Limca Book of Records as it executed in the shortest possible time in the country
RAAGESHWARI GAS TERMINAL
- Raageshwari Gas Terminal built in a record time
- Completed this project in just six months
- The project has begun in September 2018 and completed by March 2019
HKR ROAD
- Constructed 4-lane Hyderabad-Karimnagar-Ramagundam road in a record time
- The length of this road is 206 Kilometres.
GAJWEL WATER GRID
- Gajwel Water Grid inaugurated by Prime Minister.
- Completed 1200 kilometre main pipeline in just eight months
- Kamareddy, Gajwel and Godavari projects are landmark projects in Telangana.
SAUNI YOJANA
- Prime Minister Sri Narendra Modi inaugurated Sauni Yojana project in Gujarat
- Executed this project before the stipulated time
- Water pumping to an altitude of 20 meters
DAR-E-SALAM
- Dar-E-Salam is a drinking water project in Tanzania, the African continent
- Supplied 70 million litres of drinking water to 18 lakh people
- Laid 1600 kilometres pipeline
- Constructed 24 tanks