Executed Thermal power Plant for SEPC Power Pvt. Ltd. in Coastal Tuticorin
    MEIL securing project works under EPC method
    The coal-based power plant with 525 MW capacity 
    Installed a huge chimney with a height of 275 meters with modern standards
    Thermal Power Plant with Induced Draft Cooling Tower System with advanced technology
    IDCT is a cooling tower system works effectively in less space
    Cooling tower system with a capacity of 66000 cumecs per hour
    Thermal Power Plant near VO Chidambaranar Port near Tuticorin
    MEIL installed a boiler with 1700 TPH capacity, 555 MW turbine.
    Supplied 15000 tons steel, 10 km CW pipeline for this thermal power plant
    Established 48 km long transmission line to transmit power generated at the plant