Kaleshwaram Package-8 5th Motor Speed Trial Run News Clips
A speed trial in a dry run was conducted of the fifth pump of the Laxmipur pump house of Kaleshwaram project, part of Package 8, on Friday by the work agency. The agency has decided to take up the trial run of the fourth pump from Saturday. The two pumps would be ready for wet run by Sunday.






.jpeg)
.jpeg)




